Tru by Hilton Hotel @ Streets of St. Charles

City: St. Charles, Missouri

ALSO SEEN IN HOTELS

Proposed: 87-room mid-scale hotel targeting millennials

St. Louis Business Journal  (08/19/16): ' Hotel targeting younger travelers planned for Streets of St. Charles '

St. Charles Convention Hotel Expansion

City: St. Charles, Missouri

ALSO SEEN IN HOTELS

 RFP & RFQ: ​A 175-room second convention hotel

St. Louis Business Journal  (08/04/16): ' St. Charles eyes second convention center hotel '

Pfizer - Chesterfield

City: Chesterfield, Missouri

 Proposed: ​A 250,000 sf lab and 70,000 sf office building 

St. Louis Business Journal  (07/18/16): ' Pfizer said to plan new lab, office in Chesterfield '

The Metro On Manchester

City: Brentwood, Missouri

 Proposed: ​A $20-million, 6-story, 80-unit building 

  1. Managing Director
  2. Managing Director
  3. Managing Director
  4. Managing Director

Read
&
  Download  

Lydia Hill Apartments

City: Chesterfield, Missouri

 Proposed: ​A three-building, 345-unit apartment complex is being proposed on 13 acres near the Chesterfield Mall.

Watlow Electric Advanced Technology Center

City: Maryland Heights, Missouri

Under Construction




Description: The creation of a world-class technology and development center will add 30,000 square feet of new construction and renovate 56,000 square feet. 
Location: Maryland Heights, Missouri
Developer: Watlow Electric, Inc.

 Architect: Undetermined
Type: Advanced Technology Center

Proposed: 2014  Expected Completion: 2016
Cost: $30-million
Financing: Undetermined, Secured
Construction Firm(s): Undetermined
Website: N/A

Webcam: N/A
Tenants: N/A

St. Louis Post-Dispatch (03/18/14): ' Watlow adding $30 million tech center in Maryland Heights '

40 West Luxury Living

City: Chesterfield, Missouri

 Proposed

Read
&
  Download  

St. Louis Business Journal (06/02/16): ' 280-unit apartment development planned along Highway 40 '

Maryland Oaks

City: Maryland Heights, Missouri

Proposed

St. Louis Post-Dispatch (05/01/15): ' Mixed-use development planned for Maryland Heights '

Plant Science + Technology District Master Plan

City: Creve Coeur, Missouri

In Planning with Assets Built

 Link: Plant Science + Technology Area Master Plan

Read
& Download

Drury Hotel - Streets of St. Charles

City: St. Charles, Missouri

Approved, Pre-Construction

ALSO SEEN IN HOTELS

Description: A 7-story, 180-room hotel
Location: St. Charles, Missouri (Streets of St. Charles)
Developer: Cullinan Properties, Drury 

(Peoria, Illinois  and St. Louis)
Architect: Undetermined
Type: 180-room Hotel at Streets of St. Charles

Proposed: 2016  Expected Completion: Undetermined
Cost: $9-million (Estimate)
Financing: Undetermined
Construction Firm(s): Undetermined
Website: N/A

Webcam: N/A
Tenants: N/A

Sunnen Market Apartments

City: Maplewood, Missouri

Transit-Oriented Development

Pre-Construction


Description: 232-luxury units near Sunnen MetroLink Station, which is part of a $500-million project.
Location: Maplewood, Missouri
Developer: Cozad Commercial Real Estate
Architect: Undetermined
Type: Residential and Transit-Oriented Development
Proposed: 2015  
Expected Completion: 2017
Cost: $35-million (estimate)
Financing: Undetermined
Construction Firm(s): Undetermined
Website: N/A
Webcam: N/A
Tenants: N/A

The Maplewood project by Cozad Commercial Real Estate will have one of those traits: a mid-rise apartment building steps from MetroLink. Planned is a four-story building of 174 apartments. About two-thirds of the units will have one bedroom with the remainder two bedrooms

Spirit of St. Louis Corporate Center I

City: Chesterfield, Missouri

Approved, Proposed

Description: 14.82 acre site fronting I-64
Location: Chesterfield, Missouri
Developer: Duke Realty, Inc.
Architect: Rice Associates (St. Louis)
Type: Zoned and approved for up to 260,000 square feet of office space
For lease or build-to-suit
Proposed: 2013  Expected Completion: Undetermined 
Cost: $60-million (estimate)
Financing: Undetermined
Construction Firm(s): Undetermined
Website: YES
Webcam: N/A
Tenants: To Be Announced

The Quarry (at Des Peres)

City: Des Peres, Missouri

Approved, Under Construction

"CDC hauled in approximately 6,250,000 cubic yards of fill material to turn this site into one of the largest infill development tracts available in St. Louis County."

Description: In-Fill quarry development, one of the largest infill projects in St. Louis County
Developer(s):  Rangeline, CDC/Midas Hospitality, Michael Towerman, others
Architect: Undetermined
Type: Casemark, LLC (Master Planner)

Mixed-Use Development, Hotel, Apartments, single-family homes, commercial, retail
Proposed: 2016  Expected Completion: Phased
Cost: $100-million (Total Overall Cost)
Financing: Private, Secured
Construction Firm(s): Arco Construction, General Contractor
Website: N/A

Webcam: N/A
Tenants: N/A

Photo Credit: moorlander

City: Town & Country, Missouri

Approved, Under Construction

Description: A 254-unit luxury apartment complex on 8-acres (part of The Quarry project)
Location: Town & Country, Missouri 
Developer: Michael Towerman (TriStar) (St. Louis)
Architect: Undetermined
Type: Luxury apartment community at The Quarry (at Des Peres/Town Country)

Proposed: 2015  Expected Completion: Late 2016
Cost: $28-million
Financing: Secured, Commerce Bank
Construction Firm(s): Blanton Construction, Inc.
Website:
YES

Webcam: N/A
Tenants: N/A

Monsanto Research Center (Chesterfield Campus)

City: Chesterfield, Missouri

Approved, Under Construction

Description: Research campus expansion and upgrades. Two Phases.
Developer(s):  Monsanto Company
Architect: Cannon Design
Type: Research, Greenhouses 


Monsanto will spend $400 million to expand a research center focused on development of new genetically altered crops.

Monsanto said it will add a 400,000-square-foot technology building and a 32,000-square-foot service building that will house employees and greenhouse service equipment, 36 new greenhouses, additional offices and laboratory space as well as additional plant growth chambers to an existing 1.5 million-square-foot site to facilitate development of its seed and genetic trait product development.

The greenhouses and plant growth chambers can be programmed to represent any climate around the world.

Monsanto is expected to add 675 new jobs to its St. Louis campus.

Proposed: 2016  Expected Completion: 2017
Cost: $400-million, Phase I ($1.1-billion total overall cost for two phases)
Financing: Private, Secured
Construction Firm(s): McCarthy Building Companies
Website: N/A
Webcam: N/A
Tenants: N/A

NextSTL.com (05/05/15): 'Monsanto $1 Billion Plan for Chesterfield Campus may Hint at HQ Move'

St. Louis Post-Dispatch (11/12/13):  'Construction begins on big Monsanto project'

St. Louis Post-Dispatch (04/23/13): 'Monsanto plans big expansion in Chesterfield'

SSM St. Joseph's West (Lake St. Louis)

City: Lake St. Louis, Missouri

Approved, Under Construction

Description: Hospital story buildings
Location: Lake St. Louis, Missouri
Developer(s): SSM Health
Architect: TKH and The Lawrence Group (St. Louis)
Type: In Phase I involved construction of a two-story shell space in the center of an existing building and expanded the C-section operating rooms.

Phase I also included IT renovations, an upgrade to telemetry systems and a dietary renovation which features a kitchen serving the entire facility.

Phase II will feature a 73,500-square-foot vertical patient tower expansion, adding three floors and up to 105 beds to the existing two-story building. 

Phase II will also include the addition of a pneumatic tube system, central plant upgrades and a pharmacy renovation.
Proposed: 2014  Expected Completion: 2016
Cost: $70-million
Financing: Secured
Construction Firm(s): Alberici Construction 
Website: N/A
Webcam: N/A
Tenants: N/A

Above, SSM Health St. Joseph Hospital - St. Charles is under construction - just miles away from the new Lake St. Louis campus.

ALSO SEEN IN MEDICAL

Holiday Inn Express in Chesterfield Valley

In Planning


Description: 91- Hotel rooms
Location: Chesterfield, Missouri
Developer: PGB Investments Inc. 
Architect: Environs Architects and TWM Inc. is the engineering firm.
Type: Suites, Extended-Stay Hotel
Proposed: 2016  Expected Completion: 2017
Cost: $10-million
Financing: Undetermined
Construction Firm(s): Undetermined
Website: N/A
Webcam: N/A
Tenants: None

ALSO SEEN IN HOTELS
  1. St. Louis Business Journal (05/06/16): ' Plans for new Chesterfield hotel move forward '

StayBridge Suites - Westport

Approved, Under-Construction

Description: 122- Hotel rooms
Location: Maryland Heights/Westport
Developer: Midas Hospitality
Architect: Gray Design Group
Type: Suites, Extended-Stay Hotel
Proposed: 2014   Expected Completion: 2016
Cost: $10-million
Financing: Undetermined
Construction Firm(s): MC Hotel Construction
Website: YES
Webcam: N/A
Tenants: None

ALSO SEEN IN HOTELS

Mercy Chesterfield Health Campus

City: Chesterfield, Missouri

Approved, Phased Construction

  1. Managing Director
  2. Managing Director
  3. Managing Director
  4. Managing Director
The project sits on 40 wooded acres of land with great access and highway frontage. The design team has carefully worked with the existing terrain to minimize the impact to the site, preserve the basic terrain features and the existing trees. 

Clayco recently began construction on Mercy'™s new $200 million Health Campus in Chesterfield, Missouri. Serving as developer and design/builder, Clayco and Forum Studios are well into conceptual design, site due diligence, and entitlements. 

The first phase of the project included over $150 million in construction, including site development work and a 170,000 SF Virtual Care Center, which serves as a hub for Mercy'™s telemedicine initiatives. Future plans include a 219,220 SF Corporate Headquarters, a 200,000 SF Orthopedic Hospital. Phases 2 and 3 of the project are comprised of two more office buildings totaling over 300,000 SF. When completed, the project will include over 2,800 structured parking spaces, most of it under buildings and built into hillsides to preserve the existing site.


SOURCE, Clayco

ALSO SEEN IN MEDICAL