Maryville University - Saints Hall

Nearing Completion

Description: 4-story, multi-purpose facility
Location: Town and Country, Missouri
Developer: Maryville University
Architect: Lawrence Group and KWK Architects
(St. Louis)
Type: The new residence hall, to be built in two phases, will eventually accommodate about 445 students. Phase I will feature rooms for 228 students, a fitness center, an all-purpose room and student lounges on each of four floors. Surface parking for 300 cars will also be constructed. Phase II will add an additional wing with student living spaces and additional lounges on each floor.
Proposed: 2014    Expected Completion: 2017
Cost: $20-million
Financing: Private
Construction Firm(s): Paric Corporation
Website: N/A
Webcam: N/A
Tenants: To Be Announced (TBA)

ALSO SEEN IN EDUCATIONAL

Saints Hall Coming Fall 2016

  1. Saints Hall
    Saints Hall
    Phase I: A new 228-bed residential hall for Maryville University, which is located in suburban St. Louis (Town and Country).
  2. Saints Hall
    Saints Hall
    Phase I: A new 228-bed residential hall for Maryville University, which is located in suburban St. Louis (Town and Country).
  3. Saints Hall
    Saints Hall
    Phase I: A new 228-bed residential hall for Maryville University, which is located in suburban St. Louis (Town and Country).
  4. Saints Hall
    Saints Hall
    Phase I: A new 228-bed residential hall for Maryville University, which is located in suburban St. Louis (Town and Country).
  5. Saints Hall
    Saints Hall
    Phase I: A new 228-bed residential hall for Maryville University, which is located in suburban St. Louis (Town and Country).
  6. Saints Hall
    Saints Hall
    Phase I: A new 228-bed residential hall for Maryville University, which is located in suburban St. Louis (Town and Country).

World Wide Technology, Inc.

City: Maryland Heights/Westport

Approved, Under Construction

  1. Managing Director
  2. Managing Director
  3. Managing Director
  4. Managing Director

Description: 6-story,  210,000-square-foot Corporate HQs
Location: Westport, Maryland Heights, Mo.
Developer: Lodging Hospitality Management
Architect: M+H Architects 
Type: Mixed-Use, Corporate
Proposed: 2015  Expected Completion: 2017
Cost: $95-million
Financing: Secured
Construction Firm(s): Clayco & TW Constructors
Website: N/A
Webcam:
YES
Tenants: To Be Announced (TBA)

  1. Managing Director
    New 60,000 sf headquarters for World Wide Technology a $7-billion firm.
  2. Managing Director
    New 60,000 sf headquarters for World Wide Technology a $7-billion firm.

Bunge North America Headquarters

City: Chesterfield, Missouri

Approved, Pre-Construction

Description: 4-story, 150,000 square-foot Corporate HQs
Location: Chesterfield, Mo.
Developer: The Opus Group
Architect: Opus AE Group, LLC
Type: Corporate
Proposed: 2016  Expected Completion: 2017
Cost: Unknown

Financing: Undetermined
Construction Firm(s): Undetermined
Website: N/A
Webcam: N/A

Tenants: Bunge North America

  1. "Missouri Department of Economic Development officials said Bunge headquarters and Missouri Research Park projects will add nearly 200 jobs to the St. Louis region."

  1. "Today's announcement that Bunge North America will not only stay in St. Louis but also expand significantly is a big win for the region and the state of Missouri",  Gov. Jay Nixon said in a statement.
ALSO SEEN IN HOTELS

Approved, Pre-Construction

Description: Dual-Branded Hotel, 185-rooms
Location: Maryland Heights/Westport
Developer: Midas Hospitality
Architect: Gray Design Group
Type: Hospitality
Proposed: 2015    Expected Completion: 2017
Cost: $25-million
Financing: Undetermined
Construction Firm(s): MC Hotel Construction
Website: YES
Webcam: N/A
Tenants: None

Boland Place

City: Richmond Heights, Missouri

Image Credit: 40 South News

Description: 5-story, 207-unit apartment complex
Location: Richmond Heights, Mo.
Developer: Joe Cyr of ILI, LLC
Architect: Fugleberg Koch Architects
Type: Mid-rise, Multi-Family, Residential
Proposed: 2015  Expected Completion: 2017/2018
Cost: $35-million
Financing: Undetermined
Construction Firm(s): Undetermined
Website: N/A
Webcam: N/A
Tenants: N/A

Owen Ridge Innovation Park

City: Webster Groves, Missouri

Description: Innovation/Light Industrial Park
Location: Webster Groves, Missouri
Developer: Undetermined
Architect: Undetermined
Type: Light Industrial, R&D, technology and/or life sciences startups
Proposed: 2013  Targeted Completion: Phased

Cost: Undetermined
Financing: Private, Tax Credits, Grants
Construction Firm(s): Undetermined
Website:  YES
Webcam: N/A
Tenants: N/A

Phased Construction

Image Credit: 40 South News

City: Richmond Heights, Missouri

Approved, Under Construction

Description: Phase I, four-story, 281-apartments 
Location: Richmond Heights/I-64
Developer: Draper & Kramer
Architect: Humphreys & Partners Architect, LP.
Type: Residential, 4 Phases, 850-residential units
Proposed: 2006  Expected Completion: 2016
Cost: $54-million
Financing: Private, Tax Abatement
Construction Firm(s): Holland Construction
Website: YES
Webcam: N/A
Tenants: None

Image Credit: Paul Sableman, (click)

Webster University - Main Campus

Interdisciplinary Science Building

Under Construction

ALSO SEEN IN EDUCATIONAL

Approved, Pre-Construction

ALSO SEEN IN HOTELS
Description: 4-story brick and stone, 123-rooms
Location: Wentzville, Missouri
Developer: Midas Hospitality
Architect: Undetermined
Type: Hospitality, 65,000 square feet in size
Proposed: 2015  Expected Completion: January 2017
Cost: $8-million
Financing: Undetermined
Construction Firm(s): MC Hotel Construction
Website: N/A
Webcam: N/A
Tenants: N/A

Donald Danforth Plant Science Center Annex

City: Creve Coeur, Missouri

Under Construction

Description: 3-story Research Lab and Greenhouse Expansion
Location: Creve Coeur, Missouri
Developer: Donald Danforth Plant Science Center
Architect: Christner Inc. and Flad Architects
Type: 79,000 sf, Research, Science 
Proposed: 2013  Targeted Completion: 2016

Cost: $45-million
Financing: Private, Tax Credits, Grants
Construction Firm(s): McCarthy Building Companies
Website: N/A
Webcam: N/A
Tenants: N/A

Delmar Gardens III 

City: Chesterfield, Missouri

Under Construction

Description: 5-story, 125,000 SF,  Class A Trophy office/medical building
 25,000 SF floor plates
 4.5/1,000 parking ratio‹

Location: Chesterfield, Missouri
Developer: Delmar Gardens, Inc.
Architect: Gray Design (St. Louis)
Type: Delmar Gardens III, Office, 75,000sf (Pre-leased)
Proposed: 2014  Targeted Completion: 2017
Cost: Undetermined
Financing: Secured
Construction Firm(s): Undetermined
Website: N/A

Webcam: N/A
Tenants: Rabo Agrifinance, Others TBA

 

Boeing St. Louis Composite Center of Excellence

City: Hazelwood, Missouri

Approved, Under Construction

Description: A 424,000 square foot manufacturing and paint facility on Boeing's St. Louis campus.
Location: Hazelwood, Mo.
Developer: The Boeing Company, Inc.
Architect: Burns and McDonnell
Type: The plant will create up to 2000 jobs and serve as the production hub for manufacturing composite parts to fabricate wing and empennage pieces for Boeing's new 777X airplane program. 
Construction is scheduled to be completed in 2016, with work on 777X wing and empennage parts starting in 2017.
Proposed: 2014  Expected Completion: 2016
Cost: $250-million
Financing: Secured
Construction Firm(s): MC Industrial
Website: N/A
Webcam: N/A

Tenants: To Be Announced (TBA)

Phased Construction

City: Creve Coeur, Missouri

Phase I (Completed)

Phase II (In Planning)

  1. Managing Director
  2. Managing Director
  3. Managing Director
  4. Managing Director
  5. Managing Director
  6. Managing Director
Description: 3-building, 4-stories each, 450,000sf research campus 
Location: Creve Coeur, Missouri
Developer: Wexford Science & Technology
Architect: Gaudreau Inc. Architects (Baltimore)
Type: Research, BRDG Park aspires to be the world'™s leading plant and life sciences bio-park, strengthening St. Louis's renown and robust life-science industry. 
Proposed: 2008   Expected Completion: Phased
Cost: $100-million (build-out, estimate)
Financing: Private
Construction Firm(s): Undetermined
Website: N/A
Webcam: YES
Tenants: Many including KWS Saat of Germany

Chesterfield Blue Valley

City: Chesterfield, Missouri

Approved, Under Construction, Phased

Description:  The project is zoned for 1,400,000 square feet of retail, hotel, restaurant, entertainment venues and office space. 
Location: Chesterfield, Mo.
Developer: Wolfe Properties, LLC.
Architect: Undetermined
Type: Wolfe Properties, LLC has zoned and developed the infrastructure for a 137-acre mixed use development, Chesterfield Blue Valley -  modern Prairie-style architecture

Proposed: 2014  Expected Completion: Phased
Cost: $300-million
Financing: Banks
Construction Firm(s): Multiple Contractors
Website: N/A
Webcam: N/A
Tenants: Users in the development to date include St. Louis Premium Outlets (464,000 s.f.), Burlington (55,000 s.f.), Gander Mountain (60,000 s.f.), Cavender's Boot City (20,000 s.f.) and a BP convenience store and Subway (7,500 s.f.). 

Central Park Townhomes

City: Richmond Heights, Missouri

Transit-Oriented Development

Pre-Construction

Description: 42 Townhomes Starting in the Upper $300's
Location: Richmond Heights, Missouri
Developer: Pulte Homes, Inc.
Architect: Undetermined
Type: Residential and Transit-Oriented Development
Proposed: 2015  (Pre-Selling Starts Late Summer/Early Fall 2016)
Expected Completion: November 2016 
Cost: $10-million (estimate)
Financing: Private
Construction Firm(s): Undetermined
Website: YES
Webcam: N/A
Tenants: To Be Announced

The Boulevard Saint Louis - Phase II

City: Richmond Heights, Missouri

Transit-Adjacent Development

Pre-Construction

Description: Phase II, Mixed-Use Development, St. Louis Galleria
Location: Richmond Heights, Missouri
Developer: Pace Properties, Inc. (St. Louis)
Architect: Undetermined
Type: Residential, Hotel, Retail, Office 
Proposed: 2015
Expected Completion: Undetermined
Cost:  A $78.9M mixed-use development
Financing: Private, Banks
Construction Firm(s): Undetermined
Website: N/A
Webcam: N/A
Tenants: To Be Announced

The Vue at Creve Coeur

City: Creve Coeur, Missouri

Approved, Under Construction

Description: A 182-unit luxury apartment complex on 8-acres
Location: Creve Coeur, Missouri (Plant Science District)
Developer: BCC Partners (St. Louis)
Architect: Humphreys and Partners, L.P. (Dallas)
Type: Luxury apartment community in the Plant Science District.

Proposed: 2015  Expected Completion: Late 2016
Cost: $20-million
Financing: Secured, Commerce Bank
Construction Firm(s): Blanton Construction, Inc.
Website: 
YES

Webcam: N/A
Tenants: N/A

Streets of St. Charles Tower

City: St. Charles, Missouri

Approved, Proposed


​Description: A 200,000sf building in mixed-use district
Location: St. Charles, Missouri (Streets of St. Charles)
Developer: Balke-Brown Transwestern (St. Louis)
Architect: Humphreys and Partners, L.P. (Dallas)
Type: 10-story, Class A office tower prominently located on I-70

Proposed: 2016  Expected Completion: Undetermined
Cost: $45-million (Estimate)
Financing: Undetermined
Construction Firm(s): Undetermined
Website: N/A
Webcam: N/A
Tenants: N/A

Drury Hotel - Streets of St. Charles

City: St. Charles, Missouri

Approved, Pre-Construction

ALSO SEEN IN HOTELS

 Description:  A 7-story, 180-room hotel
Location: St. Charles, Missouri (Streets of St. Charles)
Developer: Cullinan Properties, Drury 

(Peoria, Illinois  and St. Louis)
Architect: Undetermined
Type: 180-room Hotel at Streets of St. Charles

Proposed: 2016  Expected Completion: Undetermined
Cost: $9-million (Estimate)
Financing: Undetermined
Construction Firm(s): Undetermined
Website: N/A

Webcam: N/A
Tenants: N/A

Sunnen Market Apartments

City: Maplewood, Missouri

Transit-Oriented Development

Pre-Construction


Description: 232-luxury units near Sunnen MetroLink Station, which is part of a $500-million project.
Location: Maplewood, Missouri
Developer: Cozad Commercial Real Estate
Architect: Undetermined
Type: Residential and Transit-Oriented Development
Proposed: 2015  
Expected Completion: 2017
Cost: $35-million (estimate)
Financing: Undetermined
Construction Firm(s): Undetermined
Website: N/A
Webcam: N/A
Tenants: N/A

The Maplewood project by Cozad Commercial Real Estate will have one of those traits: a mid-rise apartment building steps from MetroLink. Planned is a four-story building of 174 apartments. About two-thirds of the units will have one bedroom with the remainder two bedrooms

Spirit of St. Louis Corporate Center I

City: Chesterfield, Missouri

Approved, Proposed

Description: 14.82 acre site fronting I-64
Location: Chesterfield, Missouri
Developer: Duke Realty, Inc.
Architect: Rice Associates (St. Louis)
Type: Zoned and approved for up to 260,000 square feet of office space
For lease or build-to-suit
Proposed: 2013  Expected Completion: Undetermined 
Cost: $60-million (estimate)
Financing: Undetermined
Construction Firm(s): Undetermined
Website: YES
Webcam: N/A
Tenants: To Be Announced

The Quarry (at Des Peres)

City: Des Peres, Missouri

Approved, Under Construction

"CDC hauled in approximately 6,250,000 cubic yards of fill material to turn this site into one of the largest infill development tracts available in St. Louis County."

Description: In-Fill quarry development, one of the largest infill projects in St. Louis County
Developer(s):  Rangeline, CDC/Midas Hospitality, Michael Towerman, others
Architect: Undetermined
Type: Casemark, LLC (Master Planner)

Mixed-Use Development, Hotel, Apartments, single-family homes, commercial, retail
Proposed: 2016  Expected Completion: Phased
Cost: $100-million (Total Overall Cost)
Financing: Private, Secured
Construction Firm(s): Arco Construction, General Contractor
Website: N/A

Webcam: N/A
Tenants: N/A

Photo Credit: moorlander

City: Town & Country, Missouri

Approved, Under Construction

Description: A 254-unit luxury apartment complex on 8-acres (part of The Quarry project)
Location: Town & Country, Missouri 
Developer: Michael Towerman (TriStar) (St. Louis)
Architect: Undetermined
Type: Luxury apartment community at The Quarry (at Des Peres/Town Country)

Proposed: 2015  Expected Completion: Late 2016
Cost: $28-million
Financing: Secured, Commerce Bank
Construction Firm(s): Blanton Construction, Inc.
Website:
YES

Webcam: N/A
Tenants: N/A

Monsanto Research Center (Chesterfield Campus)

City: Chesterfield, Missouri

Approved, Under Construction

Description: Research campus expansion and upgrades. Two Phases.
Developer(s):  Monsanto Company
Architect: Cannon Design
Type: Research, Greenhouses 


Monsanto will spend $400 million to expand a research center focused on development of new genetically altered crops.

Monsanto said it will add a 400,000-square-foot technology building and a 32,000-square-foot service building that will house employees and greenhouse service equipment, 36 new greenhouses, additional offices and laboratory space as well as additional plant growth chambers to an existing 1.5 million-square-foot site to facilitate development of its seed and genetic trait product development.

The greenhouses and plant growth chambers can be programmed to represent any climate around the world.

Monsanto is expected to add 675 new jobs to its St. Louis campus.

Proposed: 2016  Expected Completion: 2017
Cost: $400-million, Phase I ($1.1-billion total overall cost for two phases)
Financing: Private, Secured
Construction Firm(s): McCarthy Building Companies
Website: N/A
Webcam: N/A
Tenants: N/A

NextSTL.com (05/05/15): 'Monsanto $1 Billion Plan for Chesterfield Campus may Hint at HQ Move'

St. Louis Post-Dispatch (11/12/13):  'Construction begins on big Monsanto project'

St. Louis Post-Dispatch (04/23/13): 'Monsanto plans big expansion in Chesterfield'

SSM St. Joseph's West (Lake St. Louis)

City: Lake St. Louis, Missouri

Approved, Under Construction

Description: Hospital story buildings
Location: Lake St. Louis, Missouri
Developer(s): SSM Health
Architect: TKH and The Lawrence Group (St. Louis)
Type: In Phase I involved construction of a two-story shell space in the center of an existing building and expanded the C-section operating rooms.

Phase I also included IT renovations, an upgrade to telemetry systems and a dietary renovation which features a kitchen serving the entire facility.

Phase II will feature a 73,500-square-foot vertical patient tower expansion, adding three floors and up to 105 beds to the existing two-story building. 

Phase II will also include the addition of a pneumatic tube system, central plant upgrades and a pharmacy renovation.
Proposed: 2014  Expected Completion: 2016
Cost: $70-million
Financing: Secured
Construction Firm(s): Alberici Construction 
Website: N/A
Webcam: N/A
Tenants: N/A

Above, SSM Health St. Joseph Hospital - St. Charles is under construction - just miles away from the new Lake St. Louis campus.

ALSO SEEN IN MEDICAL

Holiday Inn Express in Chesterfield Valley

In Planning


Description: 91- Hotel rooms
Location: Chesterfield, Missouri
Developer: PGB Investments Inc. 
Architect: Environs Architects and TWM Inc. is the engineering firm.
Type: Suites, Extended-Stay Hotel
Proposed: 2016  Expected Completion: 2017
Cost: $10-million
Financing: Undetermined
Construction Firm(s): Undetermined
Website: N/A
Webcam: N/A
Tenants: None

ALSO SEEN IN HOTELS
  1. St. Louis Business Journal (05/06/16): ' Plans for new Chesterfield hotel move forward '

StayBridge Suites - Westport

Approved, Under-Construction

Description: 122- Hotel rooms
Location: Maryland Heights/Westport
Developer: Midas Hospitality
Architect: Gray Design Group
Type: Suites, Extended-Stay Hotel
Proposed: 2014   Expected Completion: 2016
Cost: $10-million
Financing: Undetermined
Construction Firm(s): MC Hotel Construction
Website: YES
Webcam: N/A
Tenants: None

ALSO SEEN IN HOTELS

Mercy Chesterfield Health Campus

City: Chesterfield, Missouri

Approved, Phased Construction

  1. Managing Director
  2. Managing Director
  3. Managing Director
  4. Managing Director
The project sits on 40 wooded acres of land with great access and highway frontage. The design team has carefully worked with the existing terrain to minimize the impact to the site, preserve the basic terrain features and the existing trees. 

Clayco recently began construction on Mercy's new $200 million Health Campus in Chesterfield, Missouri. Serving as developer and design/builder, Clayco and Forum Studios are well into conceptual design, site due diligence, and entitlements. 

The first phase of the project included over $150 million in construction, including site development work and a 170,000 SF Virtual Care Center, which serves as a hub for Mercy's telemedicine initiatives.


Future plans include a 219,220 SF Corporate Headquarters, a 200,000 SF Orthopedic Hospital. Phases 2 and 3 of the project are comprised of two more office buildings totaling over 300,000 SF. When completed, the project will include over 2,800 structured parking spaces, most of it under buildings and built into hillsides to preserve the existing site.


SOURCE, Clayco

ALSO SEEN IN MEDICAL